A hardware startup moving from prototype to first production run needed 2,000 housings — too many for casting, too few to justify domestic tooling quotes. We cut steel tooling in China and ran the full batch in under four weeks, including shipping.
We ran moldflow analysis on the gate locations, added two flow leaders to correct predicted warp, and cut a single-cavity steel tool with a texture-ready A-side surface. T1 samples were approved with zero dimensional changes; only texture depth was fine-tuned between T1 and production.
| Item | Detail |
|---|---|
| Process | Injection molding, single-cavity steel tool |
| Material | ABS+PC blend (flame retardant grade) |
| Surface | SPI-B1 matte texture, A-side cosmetic |
| Analysis | Moldflow simulation, warp-corrected gates |
| Quantity | 2,000 units |
| Lead time | 25 days tool-to-parts door-to-door (DHL) |
First-article approval on T1 with no dimensional revisions. The 2,000-unit batch shipped complete with AQL sampling inspection reports, and the tool remains in our facility for the client's next reorder — lead time drops to 12 days on repeat runs.